Penalties

FlexTool uses penalty (slack) variables to relax constraints that might otherwise cause infeasibility. Each penalty has a very high cost in the objective function that makes the optimizer try to avoid these violations unless no other option is viable.

How penalties work

When a constraint cannot be satisfied (e.g., demand exceeds available supply), a slack variable absorbs the deficit. The cost of this violation is added to the objective function. The penalty cost should therefore be set high enough to prevent violations unless there is genuinely no feasible alternative, but not so high that it causes numerical issues. The penalty could also be based on perceived cost of the violation: e.g. value of lost load in case of node balance violation.

Penalty scaling with time

Most penalties scale with the duration of the violation -- a 3-hour violation costs 3 times as much as a 1-hour violation. The table below summarizes how each penalty is treated:

Penalty parameter Unit Constraint type Scales with step_duration Notes
penalty_up (node) CUR/MWh Energy balance Yes Cost per MWh of energy not served
penalty_down (node) CUR/MWh Energy balance Yes Cost per MWh of excess energy
penalty_reserve (reserve group) CUR/MW Reserve requirement Yes Cost per MW-hour of reserve shortfall
penalty_inertia (group) CUR/MWs Inertia requirement Yes Cost per MWs-hour of inertia shortfall
penalty_non_synchronous (group) CUR/MWh Non-synchronous limit Yes Cost per MWh of non-sync limit violation
penalty_capacity_margin (group) CUR/kW Capacity margin No Cost per kW of capacity shortfall per period. Analogous to investment cost -- but not annualized. It still has operational inflation adjustment.

Capacity margin penalty

The capacity margin penalty is different from the others: it represents the cost of not having sufficient installed capacity. It is analogous to an investment cost (CUR/kW) but is NOT annualized over a lifetime like actual investments. Instead, it applies as a lump cost per period. This means a penalty_capacity_margin of 1000 CUR/kW is much more expensive than an invest_cost of 1000 CUR/kW (which would be annualized to roughly 50-100 CUR/kW/year depending on lifetime and discount rate). Set the penalty to reflect the annual cost of capacity shortfall, not the total investment cost.

Economic Modelling

Overview

FlexTool minimizes total system cost over a planning horizon. The economic framework uses two key rates:

  • inflation_rate (model-level): Adjusts for general price level changes over time. Whether to use inlfation_rate depends on whether you use real or nominal values elsewhere in the input data - be consistent.
  • discount_rate (per technology): Reflects the financing cost and risk of each investment

Real vs nominal values

Economic values can be expressed in two ways:

  • Real (constant prices): All values are expressed in today's money. A power plant that costs 1000 EUR/kW today still costs 1000 EUR/kW in 2040 in real terms -- the purchasing power is the same.
  • Nominal (current prices): Values include inflation. The same plant might cost 1300 EUR/kW in 2040 at 2% annual inflation, even though its real cost hasn't changed.

Example: A coal plant costs 1500 EUR/kW today. At 2% inflation: - Real cost in 2035: 1500 EUR/kW (unchanged) - Nominal cost in 2035: 1500 x (1.02)^10 = 1829 EUR/kW approximately

Rule: Never mix real and nominal values in the same model. If inflation_rate = 0, all inputs must be in real terms. If inflation_rate > 0, all inputs must be in nominal terms.

The inflation rate

The model-level inflation_rate parameter (default: 0) adjusts all future costs to a common price base. It applies uniformly to all cost types: investment costs, fuel costs, fixed O&M, penalties, etc.

  • Real inputs (most common): Set inflation_rate = 0. All costs in all years use today's prices. A fuel cost of 50 EUR/MWh means the same purchasing power whether it occurs in 2025 or 2040.
  • Nominal inputs: Set inflation_rate to expected inflation (e.g., 0.02 for 2%). The model deflates future costs: a nominal cost of 60 EUR/MWh in 2035 is treated as 60 / (1.02)^10 = 49.2 EUR/MWh approximately in today's money.

The inflation rate applies via the factor 1 / (1 + inflation_rate)^years. Investment costs are assumed to occur at the beginning of each year; operational costs at the middle of the year (adjustable with inflation_offset_investment and inflation_offset_operations).

The discount rate (per technology)

Each unit, connection, and storage node can have its own discount_rate parameter (default: 0.05, i.e., 5%). This represents the weighted average cost of capital (WACC) -- the return that investors require to finance the technology.

The discount rate converts a lump-sum investment cost into annual payments over the technology's lifetime using the standard annuity formula:

annual_payment = invest_cost * discount_rate / (1 - (1 / (1 + discount_rate))^lifetime)

Example: A solar plant costs 800 EUR/kW with a 25-year lifetime and 5% discount rate:

annual_payment = 800 * 0.05 / (1 - 1/1.05^25) = 800 * 0.0710 = 56.8 EUR/kW/year approximately

Different technologies can have different discount rates reflecting their risk profiles: - Low risk (e.g., established solar PV): 3-5% - Medium risk (e.g., natural gas turbine): 5-7% - High risk (e.g., novel technology): 8-12%

Consistency between rates

The discount_rate and inflation_rate must use the same price basis across one model instance (either real or nominal):

Inputs inflation_rate discount_rate (entity)
Real (constant prices) 0 Real WACC (e.g., 5%)
Nominal (current and future prices) Expected inflation (e.g., 2%) Nominal WACC (e.g., 7%)

The relationship between real and nominal rates follows the Fisher equation:

(1 + nominal_rate) = (1 + real_rate) * (1 + inflation_rate)
Approximation: nominal = real + inflation approximately (e.g., 5% + 2% = 7%).

Fixed costs

Fixed costs (fixed_cost parameter on units, connections, and nodes) represent annual operation and maintenance costs that are incurred regardless of how much the asset is used. They are expressed in CUR/kW/year (or CUR/kWh/year for storage).

For existing assets, fixed costs are applied each year with inflation adjustment.

For invested assets, fixed costs are calculated over the full economic lifetime at the time of the investment decision. This allows the optimizer to correctly weigh the total cost of ownership when deciding whether to invest. In the results, these costs are reported as a separate line item from the investment annuity.

Summary of economic parameters

Parameter Level Default Description
inflation_rate Model 0 General inflation rate. Set to 0 for real inputs.
inflation_offset_investment Model 0 When in the year investment costs occur (0 = start)
inflation_offset_operations Model 0.5 When in the year operational costs occur (0.5 = middle)
discount_rate Entity 0.05 Technology-specific WACC for annualizing investments
invest_cost Entity - Overnight investment cost [CUR/kW]
lifetime Entity - Economic lifetime [years]
fixed_cost Entity - Annual fixed O&M cost [CUR/kW/year]
salvage_value Entity - Residual value at end of life [CUR/kW]

How multi-year periods are handled internally

A period can represent multiple years via the years_represented parameter on the solve entity. For example, a period p2025 with years_represented = 5 means that the modelled timeline (e.g., one representative week) stands in for 5 full years (2025-2029).

Internally, FlexTool expands this into per-year entries. A period with years_represented = 5 becomes 5 rows in the solve data, each representing 1 year at a different distance from the solve start. The inflation factor then sums the per-year inflation adjustments:

inflation_factor = Σ_y  p_years_represented[d,y] × 1/(1 + inflation_rate)^years_from_solve[y]

With inflation_rate = 0, each term contributes p_years_represented[d,y] × 1 = 1, and the sum equals years_represented (i.e., 5). With inflation_rate = 2%, each year is deflated slightly more, giving a sum of approximately 4.81.

This mechanism also supports fractional values. With years_represented = 0.5 (half-year resolution for investment decisions), the inflation factor is 0.5 × 1/(1+π)^y, correctly counting only half a year of costs.

In the objective function, operational costs follow this pattern:

cost_per_timestep × step_duration × inflation_factor / period_share_of_year

where period_share_of_year = hours_in_period / 8760 converts the modelled period to an annual equivalent, and the inflation factor then scales across all represented years. Investment costs follow a similar pattern using a separate inflation factor that accounts for investment timing.